Commercial Modified Roof Replacement in South Florida
When overlays are no longer viable, a full modified roof replacement restores waterproofing, structural integrity, and long-term performance. CLS Roofing replaces aging modified bitumen roofs with code-compliant systems built for commercial durability.
Modified roof replacement involves removing the existing roofing system and installing a new modified bitumen system from the deck up. This approach is recommended when the roof has reached the end of its service life or no longer meets code requirements.
Mejor para
End-of-life modified bitumen roofs
Resultado típico
New, fully compliant roof system
Garantía
Designed for long-term performance
¿Es Este Servicio Adecuado Para Ti?
Evaluación rápida para determinar si esta es la solución que necesitas
Este servicio es ideal si estás experimentando
Your existing roof has widespread failure
Moisture is trapped beneath the membrane
Overlays are not code-approved or feasible
Leaks persist despite repeated repairs
You need a long-term capital solution
Este servicio es ideal si estás experimentando
Multiple layers already installed
Structural or insulation deterioration
Extensive cracking or membrane failure
Failed inspections or insurance requirements
Lo Que Obtienes
01
Comprehensive roof evaluation →
Deck, insulation, structure
02
Full tear-off →
Removal of failing roofing layers
03
Deck preparation or repair →
Solid foundation
04
New insulation system →
Improved performance
05
Detailing at seams & penetrations →
Leak prevention
Opciones de Servicio y Mejoras
Según lo que encontremos, podríamos recomendar:
Solo se recomienda cuando sea necesario. Sin presiones.
Nuestro Proceso de Reparación
Seguimos el mismo proceso claro en cada uno
Commercial Modified Roof Replacement in South Florida
01
Roof Evaluation & Replacement Planning
We inspect the existing roof to confirm replacement scope, code requirements, and system selection.
Documentation & Project Coordination
You receive clear documentation and a coordinated replacement plan so all stakeholders understand scope, timeline, and expectations.
What happens here
Photo-documented inspection report
Scope & sequencing explanation
Safety and access planning
Operational coordination
02
03
Tear-Off & Surface Preparation
The existing roofing system is safely removed, and the roof deck is prepared to create a solid foundation for the new system.
What happens here
Controlled removal of old roofing layers
Deck inspection and repairs if needed
Surface preparation for new installation
New Modified Roofing Installation
We install the new modified bitumen roofing system using approved materials and methods to restore waterproofing and durability.
What happens here
Insulation & base sheet installation
Modified bitumen membrane installation
Seam, edge, and penetration detailing
Code-compliant workmanship
04
05
Final Verification & Closeout
We perform a final inspection to verify waterproofing integrity, workmanship quality, and a clean, safe job site.
What happens here
Final quality inspection
Drainage and detail verification
Site cleanup and walkthrough
Documentation handoff
Cronología del Servicio
Inspection & planning
Same week availability
Replacement
5–10 days (roof size dependent)
Final inspection
Upon completion
Scheduling is coordinated to minimize disruption.
Preguntas Frecuentes
When is replacement required instead of an overlay?
Is replacement more expensive than overlay?
How long does a new modified roof last?
Does replacement meet current code?
Will business operations stop?
Servicios Relacionados de Techos Residenciales
El conocimiento local es clave para detener fugas de manera definitiva.
Los hogares en el sur de Florida enfrentan riesgos únicos de filtraciones debido al calor, la humedad y los sistemas de cubierta envejecidos. Regularmente reparamos filtraciones en techos de tejas, tejas y techos planos residenciales en comunidades cercanas.